Featured story
From Reserve Plan to Rebuilt Roads
Talavera’s reserve study flagged its private streets years before the work was due. By 2025 routine resurfacing was no longer the right answer — so the community rebuilt the roadway down to the base, then moved into a protective sealing phase in 2026.
2025
full reconstruction, down to the base
25–30 yr
intended roadway life
2001
partnership with City Property began